Tokyo Electron: the maker of the machine next to the lithography scanner
The lithography scanner handles "exposure," but before exposure the photoresist must be evenly coated on the wafer, and after exposure it must be developed. Tokyo Electron estimates it holds 100% of the coater/developer models used with EUV lithography. It also sells etch, deposition, and cleaning equipment, making it another major equipment supplier when AI chips and HBM scale up production.
This lesson uses Tokyo Electron's (TEL) fiscal year results ending in month 3 of 2026 (March) and quarterly data from months 7 to 9 (July to September) of 2026 to see what it sells and where the money comes from.
In one sentence: where it sits in the AI industry chain
TEL sells wafer processing equipment and after-sales service to chipmakers, sitting in the "equipment" layer, on the same level as ASML.
| Item | Details |
|---|---|
| Listing and ticker | Tokyo Stock Exchange 8035 |
| Founded | 1963 |
| Headquarters | Akasaka, Minato-ku, Tokyo, Japan (Wikipedia) |
| Fiscal year end | day 31 of month 3 (March) (the company calls 2025-04 to 2026-03 "FY2026") |
| Data basis for this lesson | FY2026 financial results summary and briefing materials (2026-04-30); the most recent quarter is FY2027 Q2, i.e., months 7 to 9 (July to September) of 2026 (2026-10-30) |
What it sells
TEL has a single reportable segment, "semiconductor manufacturing equipment," so the financial results summary does not include a segment table. In its briefing materials it breaks things down two ways: new equipment by customer end use (DRAM, non-volatile memory, non-memory), and Field Solutions for after-sales service.
| Product/Service | What it is (plain language) | How it's classified in financial reports | Main buyers |
|---|---|---|---|
| Coater/developer (CLEAN TRACK LITHIUS series) | Coats photoresist on wafers and develops after exposure; used together with the lithography scanner | New equipment (counted by customer end use) | Logic and memory chip fabs |
| Etch equipment (Tactras, etc.) | Etches away material according to the pattern created by lithography | New equipment | Same as above |
| Deposition equipment (thermal processing, ALD, single-wafer CVD) | Grows layers of thin films on wafers | New equipment | Same as above |
| Cleaning equipment (CELLESTA, etc.) | Removes residual photoresist and particles | New equipment | Same as above |
| Wafer bonders, probers (Prexa, etc.) | Back end: bonding wafers together; pressing probes onto chips before testing | New equipment | Fabs doing advanced packaging and HBM, test houses |
| Parts, services, used equipment, and refurbishment | Maintenance and repair, upgrading old machines | Field Solutions | Customers with installed equipment |
The company says it has advanced products in all four key processes—deposition, coater/developer, etch, and cleaning—with a cumulative installed base of about 100,000 units (company estimate). The FY2026 briefing also mentioned: coater/developer share above 90%, dielectric etch above 50%; advanced packaging–related revenue of about 2,000 hundred million yen (200 billion yen) in FY2026, with a high share in bonders used for HBM.
Where the money comes from
Upstream · Who it buys from
Tokyo Electron · Where the money comes from
Downstream · Who pays it
Click any cell in upstream, business segments, or downstream to see its relationship with this company.
| Category | FY2026 Amount | Share of net sales | YoY | FY2027 Q2 (months 7–9 of 2026, i.e., July–September) |
|---|---|---|---|---|
| New equipment total | 17,754 hundred million yen | 72.7% | about −5% | 7,344 hundred million yen |
| of which Non-memory | about 10,475 hundred million | about 42.9% | about −9% | 56% of new equipment |
| of which DRAM | about 5,504 hundred million | about 22.5% | about −5% | 34% of new equipment |
| of which Non-volatile memory | about 1,775 hundred million | about 7.3% | about +36% | 10% of new equipment |
| Field Solutions | 6,260 hundred million | 25.6% | +16.3% | 1,910 hundred million |
| Unallocated portion | about 421 hundred million | 1.7% | — | about 96 hundred million |
| Net sales total | 24,435 hundred million yen | 100% | +0.5% | 9,350 hundred million yen |
Basis: Japanese yen, Japanese accounting standards. New Equipment and Field Solutions figures come from the briefing materials (original unit: billions of yen); the breakdown by application was only disclosed as percentages, and the amounts were estimated by multiplying those percentages by the total New Equipment figure, hence the "approx." wording. "Unallocated portion" is the net sales figure minus the two named segments.
Full-year revenue in FY2026 was nearly flat, but the quarterly cadence is clear: the single quarter of months 1 to 3 (January to March) of 2026 reached ¥7,118 × 100 million, up 28.9% from the previous quarter. By the single quarter of months 7 to 9 (July to September) of 2026, the single quarter reached ¥9,350 × 100 million, up 48.4% year over year, with new equipment for DRAM up 45% quarter over quarter. The company set its full-year FY2027 net sales forecast at ¥3.7 trillion.
In its FY2026 earnings summary, the company said capital investment in semiconductors for generative AI has grown sharply, with AI server demand driving the entire semiconductor market; the FY2027 Q2 briefing listed GPU/HBM, CPU, DRAM, and NAND as all being pulled by AI data centers.
Upstream and downstream: who it depends on, and who depends on it
Upstream. TEL designs and manufactures its equipment in-house in Miyagi, Kumamoto, Iwate, and other locations in Japan, while sourcing components from external suppliers. The 2026 Kumamoto earthquake affected the Coater/Developer and Cleaning business unit, but the company said it recovered quickly, with that unit's sales in the first half up more than 50% versus the previous half year.
Downstream. Its customers are logic, foundry, and memory chipmakers. Overseas sales accounted for 90.2% in FY2026. By region (sum of four quarters): mainland China about 34.1%, South Korea about 22.2%, Taiwan about 20.4%, Japan about 9.8%, North America about 6.8%. In the months 7–9 (July–September) of 2026, China's share rose to 36.4%.
Customer concentration: no single-customer share was found in the earnings summaries and integrated reports used in this lesson.@@I18N_KEEP_000004@@
How the products and businesses connect
- When a chipmaker builds an AI chip or HBM line, it first places orders for equipment: ASML's lithography machines paired with TEL's coater/developers, plus etch, deposition, and cleaning equipment.
- Equipment is recorded under New Equipment as "Non-memory," "DRAM," or "Non-volatile memory" according to the customer's line application.
- Once equipment is installed, parts, maintenance, and upgrades are recorded under Field Solutions; the higher the customer fab utilization, the larger this portion.
- Customers working on HBM and advanced packaging also buy TEL's wafer bonders and probe systems.
Risks the company itself lists
TEL lists 16 key risks in its Integrated Report 2026. The ones most relevant to the AI chain:
- Market volatility. A sharp contraction in the semiconductor market could cause overproduction and inventory buildup; a demand surge could leave the company unable to fulfill orders. The earnings summary also notes that the investment moves of large chipmakers increasingly affect TEL's results, which is why the next fiscal year's forecast was changed to disclose only the first half.
- Geopolitics. Geopolitical tensions, regional conflicts, and national security and industrial policies of various countries could disrupt supply chains and restrict operations. The FY2026 briefing also mentioned watching the impact of a blockade of the Strait of Hormuz.
- Procurement, production, and supply. Demand exceeding supplier capacity, component procurement delays, logistics strains, and natural disasters could all delay deliveries.
- R&D. Delays in launching new products, or products that fail to meet customer needs, would weaken product competitiveness.
Links to other lessons
- Steps of lithography (coating, exposure, development):Lithography machines and EUV
- What etch and deposition do in wafer fabrication:Wafer fabrication
- HBM and advanced packaging:Advanced packaging and HBM
- The global landscape of equipment vendors:Major players
- Equipment vendors in the same link of the chain:ASML, NAURA, Advantest
- Chipmakers that buy the equipment:TSMC, Micron, SMIC
Quiz timeIn Tokyo Electron's FY2026 new equipment sales, which customer application accounts for the largest share?
Check yourself
- I can name where Tokyo Electron sits in the AI supply chain: selling coater/developer, etch, deposition, and cleaning equipment to chipmakers
- I can name its largest revenue source: New Equipment, about 73% in FY2026, with non-memory applications making up 59% of New Equipment
- I can name one key upstream input (component suppliers) and one key downstream segment (DRAM or logic chipmakers)
Reminder